Welcome to Hebei Mutian Lifting Equipment Manufacturing Co., Ltd.

新闻资讯

Pneumatic hoist installation and commissioning process

发布时间:2020-04-06 08:54:20来源:未知浏览量:0

Pneumatic hoist installation and commissioning process

1. After receiving the pneumatic hoist, first check whether the shell, gas pipe, brake device, limit device and other important parts of the hoist are intact, whether there are mechanical deformation, scratches and other phenomena.

2. Check whether there is deformation of gas valve, joint, hoist control system, chain, hook, etc.

3. Check whether there is enough space between the pneumatic hoist in the adjacent stations and whether there is a collision prevention buffer mechanism.

4. After the installation of all major components of pneumatic hoist, functional tests shall be carried out.Press the "up/down/left/right" button through the operating handle to check whether the hoist lifting and trolley left and right walking are normal.Check whether the hoist operation button is sensitive, whether the function is normal, whether the limit device function is normal.Check exhaust noise.Check for other noises.

5. Check the pneumatic hoist to cut off the air source under load, and check the working condition of the brake system and other protective devices.

电话直呼
在线客服
在线留言
发送邮件
CONTACT:
13704083030
18633230000
刘经理
点击这里给我发消息
点击这里给我发消息
崔经理
点击这里给我发消息
还可输入字符200(限制字符200)