Welcome to Hebei Mutian Lifting Equipment Manufacturing Co., Ltd.

新闻资讯

How to set various times for low clearance electric hoists

releaseTime:2025-05-14 09:06:34source:Mu TiannumberOfPageViews:0

Setting various time parameters for low clearance electric hoists typically involves adjusting settings related to their operational timing, such as lifting/lowering speeds, delay times, or safety interlocks. Below are general guidelines for setting time-related parameters, though specific steps may vary by manufacturer and model:


1. Lifting/Lowering Speed Adjustment

Purpose: Control the speed at which the hoist lifts or lowers the load.

Steps:

Access the control panel or remote controller of the hoist.

Locate the speed adjustment settings (often labeled as "Lift Speed" or "Lower Speed").

Adjust the speed using the up/down arrows or a rotary dial (if applicable).

Test the hoist at the new speed to ensure it meets operational requirements.

Note: Some hoists may have pre-set speed limits for safety; ensure adjustments comply with manufacturer guidelines.

2. Delay Time Settings (if applicable)

Purpose: Introduce a delay before the hoist starts or stops to prevent abrupt movements or protect the load.

Steps:

Access the delay settings (often labeled as "Start Delay" or "Stop Delay").

Set the delay time in seconds or milliseconds using the control panel.

Test the hoist to verify the delay is effective and does not interfere with operations.

3. Emergency Stop Response Time

Purpose: Ensure the hoist stops quickly in an emergency.

Steps:

This is usually a factory-set parameter and may not be adjustable by the user.

If adjustment is possible, consult the manual for safety instructions (typically, emergency stop response times are not adjustable to maintain safety standards).

4. Overload Protection Timer (if applicable)

Purpose: Prevent the hoist from operating under overload conditions for an extended period.

Steps:

Locate the overload protection settings (if adjustable).

Set the maximum allowable time for overload operation (if applicable).

Test the hoist with a load near the limit to ensure the timer functions correctly.

5. Auto-Stop or Idle Timer (for energy savings or safety)

Purpose: Automatically stop the hoist after a period of inactivity.

Steps:

Access the auto-stop or idle timer settings.

Set the desired inactivity time (e.g., 5 minutes, 10 minutes).

Verify the hoist stops as expected after the set time.

6. Safety Interlock Timing

Purpose: Ensure safety gates or barriers are in place before the hoist operates.

Steps:

If the hoist has interlock systems, check the timing for gate closure/opening.

Adjust if necessary (but usually fixed for safety).

7. Manufacturer-Specific Settings

Some low clearance electric hoists may have additional time-related parameters, such as:

Soft Start/Stop Timing: Smooth acceleration/deceleration to prevent load swing.

Cycle Timer: For repetitive lifting operations (e.g., in automated systems).

Steps:

Refer to the manufacturer's manual for model-specific instructions.

Use a calibrated tool (if required) to adjust advanced settings.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)