releaseTime:2025-05-17 09:56:33source:Mu TiannumberOfPageViews:0
A comprehensive and applicable plan covering daily maintenance, regular inspections, operating procedures, emergency response, and personnel training can be developed for the operating chain crane. The following are the specific contents:
Daily maintenance plan:
Develop a detailed daily maintenance plan, including lubrication maintenance, bolt tightening, electrical system inspection, wire rope (or chain) inspection, safety device inspection, etc.
Regularly add lubricating oil or grease to various lubrication parts of the crane to ensure sufficient lubrication of the friction parts and reduce wear.
Check the fastening status of connecting bolts, nuts, and other components to avoid looseness.
Regularly inspect the electrical system, including cables, switches, control boxes, and other components, to ensure that the electrical circuits are functioning properly.
Perform visual inspection and internal wire breakage inspection on steel wire ropes or chains to ensure no damage or wear.
Regularly inspect safety devices, such as travel limiters, overload protectors, etc., to ensure proper and reliable functionality.
Regular inspection plan:
Develop a regular inspection plan to comprehensively inspect the structural components, transmission system, braking system, etc. of the crane.
Check for cracks, deformations, or wear on structural components such as the main beam, support legs, and pulleys.
Check the wear of gears, bearings, and other components in the transmission system, and replace severely worn parts in a timely manner.
Check the working status of the brake system's brakes, brake wheels, and other components to ensure smooth and reliable braking.
Operating standards:
Develop strict crane operation standards to ensure that operators are familiar with the crane's operation manual and safety regulations.
Operators should undergo professional training and possess necessary knowledge and skills in crane operation.
During the operation, strictly follow the operating procedures to prevent misoperation.
Emergency response plan:
Develop emergency response plans for crane malfunctions or accidents, clarify emergency response procedures and responsible persons.
Regularly organize emergency drills to improve the ability of operators to respond to unexpected events.
Personnel training plan:
Develop training plans for crane operators and maintenance personnel, and regularly organize training and learning.
The training content should include knowledge and skills in the operation, maintenance, upkeep, and troubleshooting of cranes.
The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoist, wire rope electric hoist,Hand chain hoist, lever hoist, pneumatic hoist and other lifting equipment