releaseTime:2025-12-10 08:33:03source:Mu TiannumberOfPageViews:0
The following applicable plans should be adopted for manual forklifts at different stages of use:
1、 Preparation stage before use
Security Inspection Plan
Hydraulic system inspection: Confirm that the hydraulic cylinder has no leaks, the hydraulic oil level is normal, and there are no impurities.
Structural component inspection: Check whether the fork is deformed or bent, and the surface should be flat without cracks; Check whether the wheels rotate flexibly and remove foreign objects from entanglement.
Safety device inspection: Ensure that components such as brakes and chains are not damaged or loose, and that safety pins, limit switches, and other functions are functioning properly.
Environmental Adaptability Plan
Clean up obstacles in the work area to ensure that the ground is flat and free of potholes.
When used in damp, dusty, or corrosive environments, take protective measures in advance (such as installing dust covers and applying rust proof oil).
2、 Operation and usage phase
Standardized operation process plan
Load control: Overloading is strictly prohibited, and the weight of goods must not exceed the rated load of the forklift; Avoid overloading and ensure that the center of gravity of the goods is located at the center of the fork.
Speed control: Drive slowly (not exceeding 3 kilometers per hour) while moving, avoiding sudden acceleration or braking.
Lift control: Control the weight of the goods during pressure lifting, and ensure that the goods are completely on the ground before moving after unloading; Lower the fork to the lowest position when dealing with high objects and low loads.
Steering control: Reduce speed when turning and avoid sharp turns in narrow spaces or slopes.
Special Scenario Response Plan
Slope operation: It is strictly prohibited to freely slide or carry people on the slope; If necessary, the operator must not stand in front of the forklift to avoid losing control of inertia and hitting people.
Eye obstruction: If the goods obstruct the line of sight, command personnel or auxiliary tools such as mirrors need to be configured.
Adverse environment: When used in high, low, or humid environments, regularly check the viscosity of hydraulic oil and the performance of electrical systems.
Operation taboo plan
It is strictly prohibited to drop goods from a height onto a forklift or load unstable or loosely packaged goods.
Prohibit single forklift operations or the use of inertia for loading and unloading goods.
No part of the body shall be placed near mechanical lifting components, on loaded goods, or under forks.
3、 Post use maintenance phase
Cleaning and Maintenance Plan
Remove dirt, soil, and debris from the forklift, with a focus on cleaning the fork frame, slide, chain, and other parts.
Check the hydraulic oil level and replenish it promptly if it is insufficient; If the oil becomes dirty or contains impurities, it needs to be replaced with new oil.
Add lubricating grease to rotating components such as axles and bearings to reduce wear.
Component Inspection and Replacement Plan
Check whether the fork, frame, wheels and other components are deformed or cracked, and repair or replace them in a timely manner.
Check the tension of the chain to avoid excessive elongation; Check whether the guide wheel is damaged and ensure that the chain runs smoothly on the track.
Check whether the seals (such as oil seals, O-rings) are aging or worn, and replace them if necessary.
Storage and Protection Plan
Park the forklift in a dry and ventilated room, avoiding direct sunlight or rain.
If parked for a long time, the hydraulic system should be started regularly to prevent oil circuit blockage or seal adhesion.
When stored in a humid environment, anti rust oil can be applied to key components or moisture-proof covers can be installed.
4、 Regular professional maintenance phase
Graded maintenance plan
Daily maintenance: Check key components such as hydraulic oil, tires, and brakes before daily use.
First level maintenance: carried out every 50 hours of operation, including cleaning the hydraulic system, checking chain tension, etc.
Secondary maintenance: Every 200 hours of operation, including replacing hydraulic oil, checking seals, adjusting brake systems, etc.
Level 3 maintenance: Conducted every 600 working hours, including a comprehensive inspection of the hydraulic system, replacement of worn parts, testing of safety devices, etc.
Professional Maintenance Content Plan
Hydraulic system: Detect oil pressure, oil temperature, and oil circuit sealing, clean or replace filters.
Structural components: Inspect the welding points and stress concentration areas of components such as forks, frames, and wheels, and perform non-destructive testing (such as ultrasonic testing).
Safety devices: Test the sensitivity of braking systems, limit switches, safety pins, and other devices to ensure proper functionality.
Record and improvement plan
Establish equipment files to record the time, content, and replacement of parts for each maintenance.
Optimize usage habits or adjust maintenance cycles based on maintenance results to form a closed-loop management.