Before starting the European wire rope electric hoist crane, the following key precautions must be strictly followed to ensure safe operation and extend equipment life:

1、 Equipment inspection and preparation

Structural integrity check

Confirm that the main structure of the crane has no cracks, deformations, or corrosion, especially checking the integrity of the main beam, end beam, and welds.

Check the status of the steel wire rope:

The steel wire rope shall not have broken wires, rust or deformation, and the remaining number of turns shall not be less than 3 (to prevent rope detachment).

Ensure that the steel wire ropes are arranged neatly on the drum to avoid cross winding.

Check the hook, pulley, and accessories:

The hook has no cracks or deformations, and the anti decoupling device is effective.

The pulley rotates flexibly without any jamming or excessive wear.

Safety device testing

Braking system: Test the sensitivity of the brake to ensure that there is no slippage when the heavy object is hovering.

Limit device: Check if the up/down limit and travel limit are reliable.

Alarm device: Confirm that the sound and light alarm signals are clear and the emergency stop button function is normal.

Interlock protection: Verify the effectiveness of protective devices such as door interlocks and overload limiters.

Electrical system inspection

Confirm that the power supply voltage matches the rated voltage of the equipment, and that the cables are not damaged or aged.

Check if the grounding protection is reliable to avoid the risk of electric shock.

The remote control or control handle functions normally and the signal transmission is stable (if using the remote control, it needs to be operated within the effective range).

Environmental confirmation

Clear obstacles in the work area to ensure smooth tracks and walkways.

Check the bearing capacity of the foundation at the work site to avoid sinking or overturning of the support legs.

Stay away from dangerous areas such as high-voltage lines and follow the minimum safety distance regulations.

2、 Preparation before operation

No load trial operation

Ring the alarm bell before starting, confirm that there is no one around, and conduct no-load lifting, rotation, and walking tests.

Check whether each institution operates smoothly without any abnormal noise or vibration.

Load test lifting

When lifting or approaching the rated load for the first time, try lifting it to a height of 20-50 centimeters above the ground and stop to check:

Brake reliability

Uniformity of force on steel wire rope

Balance of heavy objects

After confirming that there are no errors, the homework can continue.

Personnel and Command

Operators need to hold certificates and be familiar with equipment performance and operating procedures.

Strictly follow the principle of "one person, one command", and respond immediately to emergency signals.

Non operators are prohibited from entering the operating room or work area.

3、 Startup and operation specifications

Gradually accelerating

The controller handle slowly starts from the "zero position" to avoid sudden acceleration causing impact loads.

Maintain a constant speed during operation, and prohibit sudden stops or frequent directional changes.

Load limit

Overloading operations are strictly prohibited, and the load should not exceed 90% of the rated lifting capacity (when lifting two machines, the load should be evenly distributed, and the total load should not exceed 75% of the rated sum of the two machines).

Avoid inclined pulling and hanging to prevent the steel wire rope from slipping out of the groove or the equipment from overturning.

Avoidance and Warning

Closely observe the surrounding environment during operation, avoid obstacles and personnel.

No one is allowed to stay or pass under the suspended object, and the lifting height must be at least 0.5 meters higher than the ground equipment.

4、 Special working condition handling

Working in harsh environments

In case of strong wind above level 6, rainstorm or thunder and lightning during open air operation, stop the operation immediately and take wind prevention measures (such as rail clamp and anchoring device).

Check the viscosity of lubricating oil and the performance of electrical components in high or low temperature environments.

Emergency response to malfunction

If there is a malfunction or power outage during operation, immediately lower the heavy object to a safe location, cut off the power supply, and hang a warning sign.

It is prohibited to repair equipment under load, and maintenance must be carried out according to regulations after unloading.

5、 Post operation maintenance

Shutdown specifications

After completing the homework, raise the hook to a position close to the upper limit, reset the controller to zero, and cut off the power supply.

Lock the operating room door, clamp the rail clamp or take windproof measures.

routine maintenance

Regularly lubricate moving parts, clean up dust and oil stains.

Record the operating status of the equipment and replace worn parts (such as wire ropes and brake pads) in a timely manner.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)