What are the precautions for starting the emulsion crane hoist

releaseTime:2025-10-13 08:49:09source:Mu TiannumberOfPageViews:0

When starting the emulsion lifting equipment, strict control is required from four stages: pre start inspection, start operation, operation monitoring, and shutdown operation. Specific precautions are as follows:

1、 Pre startup inspection

Equipment status check

Confirm that the emulsion pump and emulsion tank are in a horizontal and stable state, avoiding tilting that may cause liquid overflow or air intake.

Check whether the connecting bolts of each component are complete and firm, especially the screws of the pump plunger and inspection cover.

Confirm that the oil level and sealing of the reducer comply with regulations, and that the pipeline joints from the pump station to the working face are securely connected without any leakage.

Check if the suction valve, manual unloading valve, and working face return valve are in the open position, and if the shut-off valve supplying liquid to the working face is in the closed position.

Emulsion inspection

Use a refractometer to check if the emulsion ratio concentration meets the regulations (3% -5% for hydraulic supports and 2% -3% for individual hydraulic supports).

Confirm that the emulsion has no oil, soap, precipitation, discoloration, or odor changes, and the liquid level is above two-thirds of the height of the tank.

Check if the inlet pressure of the mixing water is above 5 × 10 ⁵ Pa, and conduct regular water quality tests to ensure cleanliness and absence of impurities.

Electrical system inspection

Confirm that electrical equipment such as switches, motors, buttons, junction boxes, etc. are installed in dry and safe locations without water spray.

Check the gas concentration in the airflow within 20 meters of the motor and switch location. If it reaches 1.5%, the operation must be stopped and the power must be cut off.

environment check

Ensure that there is no standing water or debris around the pump station, the top plate is stable, the bottom plate is flat, and the maintenance personnel can work conveniently.

Check if the vent covers on the emulsion tank and reducer are unobstructed.

2、 Start operation

Exhaust operation

Loosen the air release plug of the pump suction chamber, and tighten it after the air in the suction chamber is exhausted and the liquid is discharged to prevent damage to the equipment caused by idling.

Start the electric motor

Open the manual unloading valve, start the motor, slowly close the manual unloading valve, and gradually increase the pump pressure to the rated value.

After starting, control the manual unloading valve and increase the pressure by 20 kilograms per minute. After 20-30 minutes, when the pressure increases to 80-100 kilograms, confirm that there is no abnormal sound, the temperature is below 65 ℃, the pump body oil level is not lower than the lower hole, and the liquid level in the tank is not lower than 1/3 of the standard surface before it can continue to work.

Signal confirmation

The signal must be confirmed. Do not drive if the signal is unclear. After receiving the liquid driving signal from the working face, shout "pump on" to the working face and then start the electric motor.

3、 Operation monitoring

Instrument monitoring

Observe whether the pressure gauge, flow meter and other instruments display normally, and whether the pressure gauge indicates accurately.

Check if the dirt indicator of the filtration station is normal and if the pressure difference indicated by the inlet and outlet pressure is between 1.5-3.0 megapascals.

Sound and temperature monitoring

Check if the sound of the monitoring device is normal, without any abnormal vibration or noise.

Check if the machine temperature exceeds the limit (maximum not exceeding 60 ℃), and the emulsion temperature should not exceed 50 ℃.

Sealing and lubrication monitoring

Check if all joints and seals are tight and free of dripping.

Confirm that the plunger is well lubricated and the lubrication pressure of the gearbox is above 2 × 10 ⁵ Pa.

Liquid level monitoring

Observe whether the liquid level in the emulsion tank remains within the specified range, and whether the automatic liquid level switch and low level protection switch are sensitive and reliable.

4、 Shutdown operation

Normal shutdown

When receiving a pump stop signal or when there is no need to supply liquid (such as when the transfer is completed), the manual unloading valve should be opened first to allow the pump to run at no load.

Press the stop button of the pump and turn the control switch handle to the power-off position.

Emergency shutdown

When abnormal sounds, odors, temperatures exceeding regulations, abnormal pressure indicated on the pressure gauge, emulsion concentration or liquid level not meeting regulations, or supply pipeline rupture and detachment are found, the pump should be stopped immediately.

After stopping the pump, it is necessary to open the manual unloading valve, cut off the power, and check and handle the fault.

Post shutdown processing

Clean the dust on the switch, motor, pump body, and emulsion tank.

After reporting the situation to the incoming driver, fill in the operation and handover records.

The main equipment produced by Hebei Makita: stage electric hoist, electric chian hoistwire rope electric hoistHand chain hoist, lever hoist, pneumatic hoist and other lifting equipment    

phone
service
message
e-mail
CONTACT:
13704083030
18633230000
Mr.Liu
点击这里给我发消息
点击这里给我发消息
Ms.Cui
点击这里给我发消息
You can also input characters200(Number of characters200)